This admin dashboard is optimized for desktop use. Some features may not work properly on mobile devices.
Loading...
Habitat
Habitat
Reset Your Password
Orders
Viewing Archived Orders
Reservation #
Order #
Location
Ship To
Date
Items
Status
Actions
Returns
Viewing Archived Returns
Return ID
Location
Date
Qty
Status
Actions
Containers
Filter by tags
•
Container Name
Materials
Tags
Location
Actions
Spaces
Space Name
Type
Dimensions
Containers
Actions
Workflows
Workflow Instances
Title
Workflow
Created By
Updated
Actions
Welding Tent Planner
welding_tent_planning
3D Tent Visualization
Pressure preview
ΔP—Pa
Steady
Time to ≥ min ΔP after close: —
Lumped model — not CFD. Tune C, n, and volume against commissioning.
Click wall tarps to select, then add.
Click wall tarps to select
1m strips 2m strips
Pressure & Ventilation
Use closed steady-state leakage (measured curve or ELA) plus door events separately. When the preview is on, set supply flow (m³/h) in the viewport field — tent lighting reflects modeled ΔP; Play door cycle animates open → close → recovery above your minimum Pa. Leakage is usually fitted as Q = C·(ΔP)n (m³/h, Pa).
1) Closed habitat — steady state
2) Door event / disturbance
Keep separate from steady leakage. Large openings dominate transient behavior; use commissioning measurements to refine.
Test calibration — fit C and n
Enter fan pressurization points (one pressure_Pa, flow_m3h per line). Switches the model to the power law and overwrites C and n.
Material Management
Database
Analytics
User Management
Email
Name
Role
Last Login
Deletion Request
Settings
Existing Templates
Template Name
Fields
Source
Status
Actions
Loading templates...
No template imported yet.
No logo uploaded
Maximum file size: 750KB. Larger images may need to be resized.
Confirm Action
Are you sure you want to proceed?
Share Planner
Create new link
Active links
No active links. Create one above.
Link
Access
Expires
Actions
Welding Tent Material Mappings
Map each welding tent requirement to a material from your database. These mappings apply to all welding tent plans.
Requirement
Mapped Material
Loading...
Reset Password
Enter your email address and we'll send you a link to reset your password.
Quick Guide
Navigation Overview
Use the left sidebar to switch between modules. Your visibility is based on your role and permissions.
Sections you do not have access to will be hidden automatically.
Orders
Create, track, and export outbound orders. Use filters and status tags to manage progress.
Returns
Log inbound returns, track defect details, and export return records.
Containers
Group materials into containers and export container summaries.
Spaces
Visualize warehouse layouts, assign containers, and use the 3D view for spatial planning.
Materials
Manage checkable equipment, forms, and inspection records.
Database
Maintain master data such as kits, DUK IDs, addresses, and accessories.
Analytics
Review performance metrics, usage trends, and defect insights.
Settings
Configure templates, company branding, and permission overrides (admins only).
Core Processes
Order Lifecycle
Create or import orders from Excel.
Open an order to review materials and IDs.
Update status as work progresses.
Export packing lists or order data when ready.
Returns Workflow
Create a return record and capture details.
Document defects and notes per item.
Export return reports for audit or logistics.
Inventory & Spaces
Create containers and assign materials.
Assign containers to spaces or rack positions.
Use 3D view for layout validation and planning.
Equipment Documentation
Open Materials and select a checkable equipment record.
Upload supporting documents or choose a form template.
Create, edit, and save the equipment form details.
Export or share the finalized documentation when needed.